Project: Palair-TG       Value – 126.00Cr     Status-Completed.

The objective of this project was to provide safe drinking water to Warangal and Khammam districts, covering a population of 3,24,160 in the state of Telangana.

Major components of the work included: construction of a 46.50X13.45 Mtr.  rectangular intake well cum pump house, lead channel, approach road and bridge, 12.5 KM of MS raw water pumping main, 90 MLD water treatment plant, 4000 KL sump, OHBR of 500 and 250 KLs, and 23.5 KM of DI Pipe gravity main.

Project: Godavari-TG       Value – 1352.00Cr     Status – Completed.

The objective of the project was to provide drinking water to a population of 12,95,000 from 1826 villages in Khammam district of Telangana State.

The scope of work included the construction of sumps for 51800 KL, Overhead balancing reservoir of 1750 KL, 784.51 Km of DI pipeline, 2001 Km of HDPE pipeline, 24.43 Km BWSC pipeline, 75.09 Km of PCCP pipeline, 75.89 km of MS pipeline and a water treatment plant of 145 MLD.

Project: Warangal-TG      Value – 950.00 Cr       Status – Completed.

The objective of this project was to provide drinking water supply in the Warangal district of Telangana State.

The scope of work included 73.54 Km of MS Pipeline, 226.95 Km of DI Pipeline, 747.96 Km of HDPE Pipeline, Two GLBRs, Seven OHBRs, intake wells, Seven sumps and Three nodes of water treatment plants.

Project: Drinking Water-AP & TG      Value – 245.00 Cr                     Status – Completed.

GWMC’s scope included constructing a pump house, laying 384 Km of DI pipe, 377 Km of HDPE pipe, eight 600 KL to 900 KL elevated reservoirs, and one 800 KL ground-level reservoir to supply water to 35,000 households.

The Tirupathi project scope included constructing two elevated reservoirs, laying 3.43 Km of DI pipe, 8.3 Km of MS steel pipe, and 30.7 Km of HDPE fittings to serve 4934 households in the holy city of Tirupathi.

Project: Balagrah & Pandua-WB   Value – 317.31 Cr  Status – Ongoing.

The objective of the project is to provide drinking water from River Hooghly to the arsenic-affected blocks of Balagrah and Pandua in the district of Hooghly, West Bengal.

The project’s major components include the commissioning of a raw water pump house over a fixed-type intake jetty, the construction of a 61 MLD water treatment plant, and the construction of 41 overhead reservoirs.

Project: HMWSSB-TG    Value – 349.00Cr      Status – Completed.

The objective of the project was to bring drinking water from Godavari River to the twin cities of Hyderabad.

Scope included Manufacturing, Supplying, Laying, Joining, Testing, and commissioning of 1800MM-Diameter MS pipeline of 44 Km. Extension project included 1000MM-Diameter of MS pipeline in Main Package I and Package III.

Project: ORR-Distribution Network-TG    Value – 292.00 Cr                Status – Ongoing.

The objective of the project is to supply drinking water to the extended areas of five Mandals along the Outer Ring Road of Hyderabad by laying HDPE pipelines of 619 Km, Dl pipelines of 161 Km and constructing eighteen service reservoirs of various capacities.