Project: PRLIS PACKAGE -7 – TG     Value – 1025.00 Cr
Status – Ongoing.

Palamuru Rangareddy Lift Irrigation Scheme (PRLIS) is the first massive irrigation scheme taken up by the Government of Telangana to irrigate 7 lakh acres in Mahbubnagar, 2.7 lakh acres in Rangareddy and 30,000 acres in Nalgonda district.

Scope of work includes construction of ‘’D’’ shaped twin tunnel for a length of 9.0km with a diameter of 11.50 m between Veeranjaneya and Venkatadri Reservoirs from Ch. 16.39km to 25.40 km in Mahabubnagar district.

Project: PRLIS PACKAGE-4 – TG   Value – 756.00 Cr  Status – Ongoing.

Palamuru Rangareddy Lift Irrigation Scheme (PRLIS) is the first massive irrigation scheme taken up by the Government of Telangana to irrigate 7 lakh acres in Mahbubnagar, 2.7 lakh acres in Rangareddy and 30,000 acres in Nalgonda district.

Scope of work includes construction of ‘’D’’ shaped twin tunnel for a length of 7.65 km with a diameter of 11.50 m between Anjanagiri and Veeranjaneya Reservoirs from Ch. 12.00km to 19.65 km in Mahabubnagar district.

Project: Road Tunnel (Silkyara Bend )- Uttarakhand
Value – 282.08 Cr      Status – Ongoing.

The Tunnel is aligned to reduce the distance between Silkyara Bend (Ch. 25.40) and Barkot (Ch. 51.00) on NH-94, a total of 25.6 km to less than 5.

Scope of work includes Construction of “Modified Horseshoe” shaped Tunnel for a length of 2 Km with a finished profile of 13.340m x 9.297m between Silkyara and Barkot.

Project: Kaleswaram Lift Irrigation Scheme (Link-IV – Parallel Conveyor system – Package No. 1) – TG      Value – 870.63 Cr
Status – Ongoing.

Scope of work includes Supply, Fabrication, Laying and Jointing of 4 rows of 5.00M diameter MS Header pipe from Pump House to Wye Branch & 8 rows of 3.80M diameter MS Pressure Mains for a length of 3.38KM each and Construction of 15.25M diameter Surge Tanks – 8 Nos.

Project: BJRUSS Phase – II, Package No. 2 – AP  Value – 1710.00 Cr  Status – Ongoing.

The massive irrigation project taken by the Government of Andhra Pradesh to provide irrigation facilities to 8.0 Lakh acres in the upland areas of Visakhapatnam, Vizainagaram and Srikakulam districts and also to provide industrial and drinking water facilities to 1200 villages covering a population of 30 lakhs.

Scope of work includes Detailed Investigation, Formation of Main canal from Ch. 40.00km to 102.00km, branch canals and distributary network including CM & CD works.