Environmental Project

Ongoing

2 X 660 MW Khurja Thermal Power Station - Water and Miscellaneous Package - UP

Value – 226.08Cr

Design, Detailed Engineering, Construction, Procurement, Supply, Erection and Commissioning of PT Plant- 129 MLD (5375 m3/hr) comprises of Cascade Aerator, HRSCC, Gravity Filters, DM Plant- 3.6 MLD (150 m3/hr) comprises of UF, RO, Mixed Bed with Regeneration System and MS Storage Tanks, Containerized DM – 360 KLD (15 m3/hr) comprises of Pre-Filtration, Ultra Filtration, RO and MB with Regeneration System, LETP- 3.6 MLD (150 m3/hr) comprises of Tube settler, CHETP – 74.16 MLD (3090 m3/hr) comprises of Coal Slurry Settling Ponds, HRSCC. CWT comprises of Chemical Treatment System of 144000 m3/hr of Cooling Water, ClO2 System for PT Plant and CW Plant – 2 x 75 kg/hr, 2x 10 kg/hr, Fire-fighting System for complete Power Plant through NTPC as Consultant.

Environmental Project

Ongoing

GWSCCL STP – TG

Value – 177.71Cr

Design, Detailed Engineering, Construction, Procurement, Supply, Erection and Commissioning of STP with O&M for 5 years at Ursugutta – 5 MLD (209 m3/hr), STP AT Pragathi Nagar – 15 MLD (625 m3/hr), STP AT Reddypuram- 100 MLD (4167 m3/hr) comprises of Interception & Diversion Structures, Sewer Collection System, Pre-Screening, Grit Removal, SBR , Disinfection with Sludge Dewatering System (Centrifuge and Dosings) through LEA ASSOCIATES as consultant.

  • Chlorine Contact Tank

  • Wet Well Tank

  • Instrument Cable Laying Up

Environmental Project

Ongoing

Suryapet Municipality - STP - Pullareddy Cheruvu and STP-Nalla Cheruvu - TG

Value – 91.07Cr

Design, Detailed Engineering, Construction, Procurement, Supply, Erection and Commissioning of STPs AT Suryapet – 10 MLD (417 m3/hr) on Turnkey Basis comprises of Sewer Collection System (UGD Network), Pre-Screening, Grit Removal, SBR, Disinfection, Sludge Dewatering System (Sludge Thickener, Centrifuge and Dosing) along with O&M of 2 years.

  • Eagle eye

  • Sequencing Batch Reactors

  • Sludge Thickener

Environmental Project

Ongoing

NPCIL Laundry and Workshop - Kudankulam

Value – 25.60Cr

Design, Detailed Engineering, Procurement, Supply, Erection and Commissioning of 6 m3/hr Laundry Effluent Treatment Plant comprises of Pre-Cleaning Filters, Evaporator (Single Effect), Radio-active removal filtration, Mechanical Filtration, Ion Exchanging Filtration with Regenerating System, Supply of Reagent System for Radioactive removal in Laundry, Workshop (UKU)- Comprises of Unified Bath with Chemical Dosing System for Radio-active removal from Pumps and Other equipment’s through RELIANCE, L&T- S&L Consultant.

Environmental Project

Ongoing

TSGENCO - 5 X 800 MW Yadadri Thermal Power Station - TG

Value – 24.38Cr

Design, Detailed Engineering, Procurement, Supply, Erection and Commissioning of 314.47 MLD (13103 m3/hr) Pre-Treatment Plant comprising of Cascade Aerators, Clarifiers-HRSCC with Sludge De-watering System (Thickener and Centrifuge) through BHEL, TCE as consultant.

  • PT 30M DIA Rotaing Bridge Clarifier

Environmental Project

Ongoing

3 X 800 MW PVUNL Patratu TPP Phase - I - ETP

Value – 12.33Cr

Design, Detailed Engineering, Procurement, Supply, Erection and Commissioning of 250 m3/hr of Effluent Treatment Plant including Collection System with Oil Removal and Treatment comprises of TPI, Tube Settler, HRSCC, Pre-Filtration, Ultra Filtration and RO with respective dosings through BHEL.

Environmental Project

Ongoing

NPCIL OCWT - Kudannkulam

Value – 8.43Cr

Design, Detailed Engineering, Procurement, Supply, Erection and Commissioning of 45 m3/hr Oil Containing Water Treatment System comprises of TPI, DAF, PSF, ACF and sludge Handling System (Thickener and Centrifuge) through RELIANCE, L&T- S&L as consultant.

Environmental Project

Ongoing

NPCIL WWNS – Kudannkulam

Value – 4.90Cr

Design, Detailed Engineering, Procurement, Supply, Erection and Commissioning of 400 m3/hr Waste Water Neutralization with Dosing System through RELIANCE, L&T- S&L as Consultant.

Environmental Project

Completed

Vedanta - ETP Recycling - Odisha

Value – 25.92Cr

Design, Detailed Engineering, Procurement, Supply, Construction, Erection and Commissioning of 12 MLD (500 m3/hr) Effluent Treatment Plant comprises of HRSCC, UF and RO for implementation of Zero Liquid Discharge on turnkey basis at 4X600 MW thermal power plant at Jharsuguda.

  • Filtration

  • Overall Plant

  • RO Systems

Environmental Project

Completed

RINL ETP – VSP

Value – 7.80Cr

Augmentation of existing CCP of RINL, VSP to run Batt#5 along with Batt #1, 2, 3, & 4: Design, Detailed Engineering, Procurement, Supply, Construction, Erection, testing and commissioning of Cooling Towers-100 m3/hr, Tar settling System-50 m3/hr, Thickener- 15 m3/hr and Sludge Dewatering Plant-50 m3/day on Turnkey Basis for existing MBC Treatment Plant (Effluent Treatment Plant) through MECON Consultant.

  • Cooling Tower

  • Filter Press

  • Thickener System

Environmental Project

Completed

RINL DM PLANT - VSP

Value – 4.88Cr

Design, Detailed Engineering, Construction, Procurement, Supply, Erection and Commissioning of 75 m3/hr Additional Stream of DM Plant comprises of Degasser System, Strong Acid Cation Exchanger, Strong Base Anion Exchanger and Mixed Bed Exchanger with Regeneration System on turnkey basis through MECON Consultant.

Environmental Project

Completed

ETP Recycling - Hirdaramani

Value – 1.62Cr

Design, Detailed Engineering, Procurement, Supply, Erection and commissioning of 1 MLD (42 m3/hr) comprises of Pre-Filtration, Ultra Filtration and Reverse Osmosis Plant with sludge handling system for Hirdaramani Woven Industry at Seethawaka, Srilanka.