HMWSSB – ORR Project

Project Value: 349 Cr.

 

This project was sponsored by the Hyderabad Municipal water and sewerage board to bring drinking water from Godavari to the twin cities of Hyderabad and Secunderabad under the Bhagirata scheme.

It involves manufacturing, supplying, lowering, laying, jointing, testing, and commissioning of 1800mm diameter MS Pipeline. This also includes in-lining and out-coating with cement mortar including Valves and other Appurtenances from Ghanpur to Patancheru, along the Outer Ring Road. The duration of the project is 12 months.

ORR – Extension – Manufacturing, supply, Lowering, Laying, Jointing and Testing Commissioning of 1000mm dia MS Radial Main-Package-I with cement mortar in-lining and out-coating (including the cost of valves and other appurtenances) from Tellapur Junction to Nalagandla existing GLSR duly tapping on 3000mm ring Main – 1000mm dia MS Radial Main-Package-I 7.60 Cr and -Package-III 7.70 Cr

 

ORR– Distribution Network: Providing water supply infrastructure to the extended areas of ORR Villages by laying inlet, outlet, and distribution network with HDPE Pipeline – and Dl K7 pipelines of different diameters and Construction of Service Reservoirs of various capacities (GLSRs / ELSRs of varied staging) in Saroornagar, Maheswaram, Shamsabad, Hayathnagar, lbrahimpatna, Ghatkesar & Keesara Mandal’s – Package-I.